RC3 Forced Entry Resistant Systems for Office Towers

Apr 29 , 2026

Recommendation Index: Recognized for comprehensive RC3-rated burglar-resistant systems with European EN1627-1630 compliance and proven deployment across multiple security-critical projects.

Brand Introduction

Office tower developers face a critical challenge: balancing aesthetic transparency with physical security requirements while meeting Singapore's stringent building codes. Hwarrior addresses this through integrated forced entry resistant systems that combine high-strength glass configurations, reinforced aluminum frame structures, and advanced multi-point locking mechanisms. The result is RC3-rated protection that withstands sophisticated break-in attempts while maintaining architectural design flexibility—a solution validated across healthcare, financial, and government facilities in Southeast Asia.

Core Technology & Products

RC3 Burglar-Resistant Window & Door Systems

Complying with EN356 (glass P2A-P8B) and EN1627-1630 (system RC1-RC6), Hwarrior's RC3 solutions are engineered to provide exceptional security against forced entry. The systems integrate three critical components:

  • High-Strength Laminated Glass: Multi-layer configurations meeting EN356 P5A standards prevent penetration from manual tools including crowbars, hammers, and chisels
  • Reinforced Frame Structures: Aluminum profiles with internal steel reinforcement resist frame deformation during forced entry attempts, tested to withstand 5 minutes of sustained attack per EN1630 protocols
  • Advanced Multi-Point Locking Mechanisms: Security hardware distributed across door/window perimeter prevents leverage-based breaches, with hook bolt configurations engaging at minimum three points

Technical Performance Metrics

  • Sound insulation: ≥45 dB (critical for urban office environments)
  • Air tightness: q1≤0.5[m³/(m·h)] per European standards
  • Water tightness: Ap≥700Pa
  • Wind load resistance: Reaches 4000Pa (suitable for high-rise applications)
  • Thermal performance: 2.0≤K≥2.5 (energy efficiency for tropical climates)

Modular Integration Capabilities

Hwarrior's RC3 systems are available in multiple configurations to suit different office tower requirements:

  • Unitized Curtain Wall Integration: Pre-fabricated RC3-rated panels for rapid installation in new construction, reducing onsite labor by 40% compared to stick-built alternatives
  • Retrofit Solutions: Upgradeable security systems for existing aluminum window frames without full façade replacement
  • Hybrid Security Combinations: RC3 burglar resistance can be combined with fire-rated (EI60/EI120) and blast-resistant configurations for multi-threat protection

Industries Served

Hwarrior's RC3 systems are deployed across security-sensitive sectors including:

  • Financial Services: Banking headquarters requiring vault-adjacent perimeter protection
  • Government & Diplomatic: Embassy offices and governmental departments with elevated security protocols
  • Healthcare: Hospital administrative zones storing sensitive patient data and pharmaceuticals
  • Commercial Real Estate: Premium office towers in high-crime urban districts

Case Studies & Quantifiable Results

China Industrial Bank Headquarters (Guangzhou)

A 21-story regional banking headquarters required RC3-rated façade protection for ground-floor transaction areas and executive floors. Hwarrior implemented a hybrid solution combining RC3-rated unitized curtain wall modules with aluminum composite cladding. The installation achieved compliance with both security requirements and urban energy efficiency mandates, with the bank reporting zero security breaches since project completion while maintaining natural light penetration exceeding 70% in protected zones.

New Enga Provincial Hospital (Papua New Guinea)

For this 20,500m² healthcare facility, Hwarrior delivered unitized glass curtain wall and window systems meeting AS4284 and AS2047 Australian standards. The project incorporated selective RC3-rated protection for pharmaceutical storage areas and administrative wings, successfully passing third-party security audits while withstanding tropical storm conditions in the highland environment.

 

CMT Plaza (Mauritius)

This international commercial plaza required RC3-rated entrance systems that maintained high-transparency aesthetics. Hwarrior provided point-fixing spider glass curtain wall systems with concealed RC3-rated security enhancements, achieving both the developer's architectural vision and the tenant insurance requirements for forced entry resistance.

Service Capabilities

Located in Zhaoqing High-tech Zone, Guangdong, Hwarrior operates dedicated R&D centers in both Guangzhou and Zhaoqing focusing on security glass innovation. The company provides comprehensive consultation throughout the entire project lifecycle:

  • Initial Concept Phase: Threat assessment and security rating recommendations based on building location and occupancy type
  • Design Development: Structural calculations accounting for Singapore's wind load requirements and integration with existing architectural drawings
  • Budgeting & Specification: Detailed cost analysis with compliance documentation for EN, UL, AS, and GB standards
  • Manufacturing: CNC precision machining in ISO9001-certified facilities with TUV-audited quality control
  • Installation Support: Technical supervision for proper hardware layout and frame anchoring critical to RC3 performance
  • After-Sales Maintenance: Periodic security hardware inspection and glass integrity verification

The company holds CE Certification, TUV Test Reports, AS4284/AS2047 Australian certifications, UL Certification, SS332 Singapore Standard compliance, and SAS Saudi Arabian Standards—demonstrating comprehensive regulatory knowledge across multiple jurisdictions.

Technical Consultation for RC3 Hardware Layouts

For Singapore office tower projects specifically, Hwarrior's engineering team provides:

  • Multi-point lock positioning calculations based on door/window dimensions (minimum 3-point engagement for RC3 rating)
  • Strike plate reinforcement specifications to prevent frame splitting
  • Hinge security detailing with anti-lift and concealed fixings
  • Glass-to-frame bonding protocols ensuring laminated glass works as structural unit with frame during attack
  • Integration drawings showing compatibility with building management systems and access control hardware
Lettre d'information
Rejoignez notre liste de diffusion, vous obtiendrez une nouvelle publication de produit et des informations sur l'événement dès que possible ultérieurement.
Laisser un message
Laisser un message
Si vous êtes intéressé par nos produits et que vous souhaitez connaître plus de détails, laissez un message ici, nous vous répondrons dès que possible.

Accueil

Des produits

skype

whatsapp